PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Backfilling and waterproofing around Elev. 5-6 Foundatio Walls Facing South (800x600).jpg Securing the Slip Forms at Elev. 1,2,3 2nd floor Facing South-East (800x600).jpg Setting the rebar columns at Elev. 1,2,3 2nd floor Facing South-East (800x600).jpg Compacting the soil around Elev. 5-6 Foundation Walls Facing South (800x600).jpg Setting the rebar columns at Elev. 1,2,3 2nd floor Facing South-East -2 (800x600).jpg
Next page Backfilling and waterproofing around Elev. 5-6 Foundatio Walls Facing South (800x600)
Backfilling and waterproofing around Elev. 5-6 Foundatio Walls Facing South (800x600)